Guide

Event setup and teardown: what the job demands and how to look after your body

Hours, loads, height and night work in event setup and teardown, with what Argentina's Law 19,587 and Resolution 295/03 say about lifting weight at work.

6 min readBy SOMOS DER

Setup is the part of the event nobody sees: trucks unloaded in the early hours, stage platforms going up, miles of cable, and all of it again in reverse when the last light goes off. It's one of the most common ways into event work, and also the one that asks most of your body. This guide explains what the job demands and how to look after yourself, with what Argentine rules say. At the end there's a section for people who hire.

What the job demands

Hours that aren't everyone else's. The build happens before the audience arrives, and often the space is only free the night before or from the early morning. Teardown starts when the audience leaves. That means shifts that start or end at odd hours and, at multi-day events, back-to-back days.

Loads. Equipment cases, platforms, panels, furniture, cable drums. A lot of what moves in a setup is lifted by hand, on the floor of a truck, on a ladder or in a narrow corridor.

Delivery pressure. The event has an opening time and it doesn't move. In the build the rush comes at the end; in teardown, at the start, because the space has to be handed back.

Height. Some tasks at height (hanging lighting, sound or structures) belong to specialised positions, like the rigger. If your position is setup or loading, don't climb up to do another position's job, even if you're asked in a hurry.

Lifting weight: what Resolution 295/2003 says

Resolution 295/2003 of Argentina's Ministry of Labour, Employment and Social Security has an annex on manual lifting of loads. What's important to understand:

  • There's no single maximum weight. The limit values come from tables and depend on how many hours per day the task lasts, how many times per hour the load is lifted, the height the lift starts from and how far from the body the load is.
  • Lifting far away or high up is worse. The rule says routine tasks shouldn't start more than 30 cm above the shoulder or more than 180 cm from the floor.
  • There are situations where the limit drops. Among others: shifts of more than 8 hours, twisting the trunk while lifting, lifting with one hand, heat and humidity, unstable objects, poor grip and feet not properly planted. At a setup that's nearly all the time.
  • For some combinations there's no safe limit. In certain cases of repeated lifting, the rule says outright that no safe limit is known.
  • If the values are exceeded, action is needed. The resolution requires control measures when the limits are exceeded.

In day-to-day terms: keep the load close to your body, don't twist with the weight on you, use trolleys and hand trucks when available, and anything heavy or unstable is lifted by two people. Asking for help doesn't make you look bad: it's what the rule considers safe.

Night work and rest

Argentina's Employment Contract Law has two rules worth knowing if you're employed:

  • Article 200: a shift worked entirely at night cannot exceed seven hours, and night runs from 9 p.m. to 6 a.m.
  • Article 197: there must be a break of at least twelve hours between the end of one shift and the start of the next.

Beyond the letter of the law, it's accumulated tiredness that injures people: when you're sleepy you misjudge a weight, step badly on the truck ramp and let go of a box too early. If you're offered teardown after working the build and the event, look carefully at how many hours you'll have behind you. For organising shifts and relief at long events there's shift planning for long events.

What's on you and what's on whoever hires

Argentina's Law 19,587 on Health and Safety at Work divides obligations:

  • The employer has to take health and safety measures to protect workers' lives and integrity, keep machinery, installations and work tools in good condition, have means to give first aid immediately and train people on the risks of each task (articles 8 and 9).
  • The worker has to follow safety rules and the instructions on protective equipment, and respect safety signs (article 10).

On equipment, Argentina's Occupational Risk Authority (SRT) says that personal protective equipment must be provided by the employer, and that the worker signs a receipt.

How to make it to the end of teardown in one piece

  • Closed, sturdy footwear and clothes that won't catch. If you're given protective equipment, use it.
  • Eat and drink water even if nobody calls a break. Carry something with you.
  • Ask before moving something you don't know: how much it weighs, where it goes, whether it comes apart.
  • Watch the floor: cables, ramps, half-built platforms and poor light are the usual combination.
  • Speak up if something hurts or you feel unwell. Carrying on is how a niggle becomes an injury.

If it's your first event, first day working at an event covers what to bring and how to present yourself.

If you hire setup crews

  • Write down the real hours, including teardown, and don't chain build, event and teardown on the same people without rest.
  • Size the crew by the loads, not just by the time: heavy items take two.
  • Provide trolleys, hand trucks and ladders in good condition, and define who does tasks at height.
  • Assign a setup lead who decides the order and stops things when something isn't safe.

For the paperwork of hiring per event there's paperwork for hiring temporary event staff.

How it's covered in LABURO

In LABURO, Setup and teardown and Loading and unloading are roles in the catalogue, along with Stagehand and Rigger. When an event needs those roles, the LABURO team builds the staff by role and area, and each person receives the offer with pay and hours and accepts it from their phone. Workers can also apply to available jobs.

Sources

Looking for event work in Argentina?

LABURO is the event staffing platform built by SOMOS DER in Buenos Aires, and joining the pool is free. If you live in Argentina and want to know how to sign up, write to us on WhatsApp.

FAQ

What people ask us most.

What does a setup and teardown worker do at an event?

Before the event they build what the space needs (stage, stands, furniture, structures, cabling) and they take it down when the audience leaves. They work with the technical and production team, following a plan or the instructions of whoever coordinates the build. It's a physical job, with long shifts and often at night.

Is there a maximum weight you can lift at work in Argentina?

Resolution 295/2003 of Argentina's Ministry of Labour sets limit values for lifting loads by hand, which depend on how many times per hour the load is lifted, how many hours the task lasts, the height it's lifted from and the distance between the load and the body. It isn't a single number: it's looked up in tables. When those values are exceeded, the rule requires control measures.

How many hours can a night shift last?

Argentina's Employment Contract Law (article 200) says a shift worked entirely at night cannot exceed seven hours, and treats 9 p.m. to 6 a.m. as night time. Article 197 requires a break of at least twelve hours between the end of one shift and the start of the next. Those rules apply to employed work.

Who provides personal protective equipment at a setup?

According to Argentina's Occupational Risk Authority (SRT), personal protective equipment must be provided by the employer, and the worker signs a receipt. Law 19,587 also obliges the worker to follow safety rules and look after the equipment they're given.

How do I find setup work through LABURO?

LABURO operates in Argentina and the app is in Spanish. In your profile you mark the positions you can do, such as Setup and teardown, Loading and unloading, Stagehand or Rigger, and you state your province, whether you have your own transport and how much notice you need to take a job. Then offers reach you and you can also apply to available jobs. Write to us on WhatsApp to know how to join.

LABURO

Real staff,
for your event.

LABURO is the event staffing platform built by SOMOS DER, an event production company in Buenos Aires, Argentina. If you are planning an event in Argentina or want to know how it works, write to us.